OUR REFERENCES

Nogay Group delivers the best integrated solutions through local knowledge combined with a global presence.
No other systems integrator has experts permanently on the ground in all these locations.

Nogay Group orchestrates the world’s most advanced machines using communications and information technology that puts this power at your fingertips. We provide design, supply and installation services for electrical, mechanical, plumbing and ELV systems in a broad range of sectors and building types including high-end commercial, industrial and public structures.
Our full-scale service capabilities range from design and construction to testing & commissioning and project management in several locations including Turkey, Saudi Arabia, Russia, Azerbaijan, Kazakhstan and Libya.
Nogay Group has the necessary contracting know-how to deliver complete project management services. We “integrate” the right experts into your projects and they work seamlessly throughout the project life. In our understanding, business integration means fully integrated EPC contracting solutions including construction, electromechanics, automation, architecture, plus end-to-end systems integration service including specialist solutions for broadcast and business ICT.

PROCUREMENT & CONSTRUCTION

IZMIR-ANKARA HIGH SPEED TRAIN RAILWAY TUNNEL PROJECTS

CLIENT: TCDD (Turkish National Railway System)
LOCATION: Afyon, Usak, Banaz / Turkey
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 16.2 km total (8 Tunnels)
DURATION: 2019
SCOPE OF WORKS: Procurement & Construction

 

BURSA-ANKARA HIGH SPEED TRAIN RAILWAY TUNNELS PROJECT

CLIENT: TCDD (Turkish National Railway System)
LOCATION: Bilecik, Bursa / Turkey
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 4.6 km total (2 Tunnels)
DURATION: 2019
SCOPE OF WORKS: Procurement & Construction

 

IZMIR-ISTANBUL BRIDGE &
ROADWAY PROJECT

CLIENT: NOMAYG J.V.
LOCATION: Dilovası-Altınova / Turkey
CONTRACTOR: IHI-ITOCHU / STFA
SUBCONTRACTOR: Nogay Group
SCOPE OF WORK: 44.000 m³
CONCRETE CASTING: 20.680m²
DURATION: May 2013 – July 2014
SCOPE OF WORKS: Körfez (Bay) Crossing / Bridge North Anchoring / Structures Construction Formwork and 6.500 tonnes rebar installation will be carried out for foundation and footing

MULTILEVEL CAR PARK FOR 1100

CLIENT: Belmart Plaza
LOCATION: Minsk / Belarus
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 39,450 m²
DURATION: November 2013
SCOPE OF WORKS: Design & Built Turn Key Construction

RECONSTRUCTION

HUBER MANSION

CLIENT: Presidency Of The Republic Of Turkey
LOCATION: Istanbul / Turkey
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 2,800 m²
DURATION: 2019
SCOPE OF WORKS: Reconstruction

HOTEL PROJECTS

HILTON MINSK HOTEL

CLIENT: MB Development Group & Flagship Resort LLP.
LOCATION: Minsk / Belarus
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 22,000 m²
DURATION: May 2012 – April 2014
SCOPE OF WORKS: Design & Built Turn Key Construction

BUSINESS CENTER KOCA GROUP

CLIENT: Subenko LTD & Koca Group
LOCATION: Istanbul / Turkey
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 9,000 m²
DURATION: August 2012 – August 2013
SCOPE OF WORKS: Design & Built Turn Key Construction

NOGAY GROUP CONCEPT

CLIENT: NOGAY REAL ESTATE DEVELOPMENT
LOCATION: Minsk / Belarus
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 8,750 m²
DURATION: June 2012 – August 2013
SCOPE OF WORKS: Design & Built Turn Key Construction

HOLIDAY INN HOTEL PROJECT

CLIENT: Merkury Invest LLP
LOCATION: Almaty / Kazakhstan
CONSULTANT: Bureau Veristas
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 15,500 m²
DURATION: September 2005 – July 2007
SCOPE OF WORKS: PCC Contract (Procurement, Construction and Commisioning)

DOSTYK HOTEL

CLIENT: JSC “Dostyk Hotel”
LOCATION: Almaty / Kazakhstan
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 12,500 m²
DURATION: June 2006 – October 2007
SCOPE OF WORKS: Turn-key Hotel Renovation and Rehabilitation Project (Structural, Architectural,
Mechanical and Electrial Works)

CP RENAISSANCE HOTEL – ATYRAU

CLIENT: CP HOTELS, Beratex
LOCATION: Atyrau / Kazakhstan
CONSULTANT: Bureau Veristas
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 15,500 m²
DURATION: February 2003 – August 2004
SCOPE OF WORKS: Structural Works

CP RENAISSANCE HOTEL – AKTAU

CLIENT: CP HOTELS, Beratex
LOCATION: Aktau / Kazakhstan
CONSULTANT: Bureau Veristas
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 14,500 m²
DURATION: October 2003 – June 2004
SCOPE OF WORKS: Structural Works

HOUSING PROJECTS

BUHARJIRAU RESIDENCE PROJECT

CLIENT: TS – Engineering, Stroy-Invest
LOCATION: Almaty / Kazakhstan
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 150,000 m²
DURATION: October 2005 – September 2007
SCOPE OF WORKS: Structural Works

HOUSING PROJECT – ATYRAU

CLIENT: Alwin Investment Group
LOCATION: Aktyrau / Kazakhstan
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 13,000 m²
DURATION: October 2003 – February 2005
SCOPE OF WORKS: Turn key construction

MICRO REGION HOUSING PROJECT – AKTAU

CLIENT: Alwin Investment Group
LOCATION: Aktau / Kazakhstan
CONTRACTOR: Nogay Group
CONSTRUCTION AREA: 32,500 m²
DURATION: June 2003 – October 2004
SCOPE OF WORKS: Turn key construction with tunnel form work system

7th CONTINENT HOUSING &
TRADE CENTER PROJECT

CLIENT: TOO Kontinent Stroy
LOCATION: Astana / Kazakhstan
GENERAL CONTRACTOR: Ceylan LTD
SUBCONTRACTOR: Nogay Group
CONSTRUCTION AREA: 120,000 m²
DURATION: July 2005 – September 2007
SCOPE OF WORKS: All Mechanial Works Including. Porcurement, Installation, Start Up and
Commissioning works. HVAC System, Plumbing System Fire Fighting Systems

BUSINESS CENTERS

TCO OFFICE BUILDING PROJECT

CLIENT: TCO (Tengizchevrol)
LOCATION: Atyrau / Kazakhstan
GENERAL CONTRACTOR: Fintraco – Tepe J.V.
CONSTRUCTION AREA: 35,000 m²
DURATION: May 2001 – August 2002
SCOPE OF WORKS: H.V.A.C. Systems, Plumbing Systems, Fire Fighting Systems, Building Automation Systems, External Pipeworks

KEN DALA BUSINESS CENTER

CLIENT: TS Engineering
LOCATION: Almaty / Kazakhstan
GENERAL CONTRACTOR: Kazinter LLP
SUBCONTRACTOR: Nogay Group
CONSTRUCTION AREA: 35,000 m²
DURATION: June 2003 – February 2004
SCOPE OF WORKS: Heating, Cooling & Ventilation System (Procurement, Construction, Start-up Commissioning)

ALWIN BUSINESS CENTER

CLIENT: Alwin Investment Group
LOCATION: Almaty / Kazakhstan
SUBCONTRACTOR: Nogay Group
CONSTRUCTION AREA: 35,000 m²
DURATION: August 2003 – May 2004
SCOPE OF WORKS: Heating, Cooling & Ventilation System (Procurement, Construction, Start-up Commissioning)

INDUSTRIAL PROJECTS & INFRASTRUCTURE WORKS

1540 MW ALIAGA NATURAL GAS COMBINED CYCLE POWER PLANT

CLIENT: Intergen – ENKA
LOCATION: Izmir / Turkey
GENERAL CONTRACTOR: Bechtel – ENKA JV
SUBCONTRACTOR: Nogay Group
DURATION: May 2002 – November 2002
SCOPE OF WORKS: Main Cooling Water Supply (From Sea Water) • Raw Water Supply, Underground Fire Fighting, Water System & Fire Hydrant System, External & Internal HDPE, Pipework & Valve Installation (ø1000,ø800)

1540 + 770 MW GEBZE ADAPAZARI NATURAL GAS CYCLE POWER PLANT

CLIENT: Intergen – ENKA
LOCATION: Sakarya / Turkey
GENERAL CONTRACTOR: Bechtel – ENKA JV
SUBCONTRACTOR: Nogay Group
DURATION: May 2001 – November 2001
SCOPE OF WORKS: Raw Water System, Waste Water System, Rain Water System, Closed Circuit Cooling Water System, Pressurised Air System, Portable Water Supply, Fire Fighting System, Demineralised Water System, Infrastructure Works

1400 MW BURSA NATURAL GAS COMBINED CYCLE POWER PLANT

CLIENT: TEAS Administration
LOCATION: Bursa / Turkey
GENERAL CONTRACTOR: ENKA
SUBCONTRACTOR: Nogay Group
DURATION: April 1998 – January 1999
SCOPE OF WORKS: H.V.A.C System, Potable Water System, Waste Water System, Fire Fighting System, Pressurised Service Air and Instrument Air Systems, Various Equipment and Pipe Installations

 

AFSIN-ELBISTAN 4×360 MW B THERMAL POWER PLANT

CLIENT: TEAS General Administration
LOCATION: Elbistan / Turkey
GENERAL CONTRACTOR: ENKA
SUBCONTRACTOR: Nogay Group
DURATION: May 2001 – August 2001
SCOPE OF WORKS: Main Cooling Water System. Mechanical Instllation (2750 tonnes), Piping Installation (ø1829mm – t=16mm), Equıpment Installation, Cathodic Protection, Hydrostatic Tests, NDT Tests. Raw Water Pool Civil Works, Ash Discharge Pool Civil Works, Raw and Ashed Water Pump Station Civil Works, Waste Water and Electric Duct Bank Sytems, Civil Works for Power Plant, Main Cooling Water System Civil Works (Ins. Excavating and Backfilling)

 

BAKU WATER TREATMENT PLANT

CLIENT: Absheron Water Joint Stock Co.
LOCATION: Baku / Azerbaijan
CONSULTANT: Brown & Root
GENERAL CONTRACTOR: Termomechanica Ecologia SpA
SUBCONTRACTOR: Nogay Group
DURATION: February 1999 – February 2001
SCOPE OF WORKS: Filter, Chemistry and Chlorine Buildings Civil Works Rehabilitation, New Construction of Filter and Chemistry Pools with All Electro- Mechanical Systems, Collapsing Pools Rehabilitation with All Electro-Mechanical Systems, New Water Distribution Towers Constructions, New Mud Discharging System and Pump Units, Installation New Chlorine and Measuring Units Installation Testing and Commissioning

 

DOMODEDOVA JET – FUEL SERVICE STATION

CLIENT: Arminda Investments Ltd.
LOCATION: Moscow / Russia
GENERAL CONTRACTOR: Atak – NOGAY J.V.
DURATION: 1999 – 2001
SCOPE OF WORKS: Tanks & Pipes and Kerosenous Earth Removal. New Tank Plants Civil & Infrastructure Works. Fabrication, Erection and Coating of New Tanks (5.000 m³), Conical Reshaping, Repair and Coating of Existing Tank Bases. Replacment of All Kerosene Lines With Enamel Coated Pipes (Interior & Exterior). Installation of New Pump Station and Measuring Stations. Installation of New Fire Fighting System, New Fire Alarm and Warning System, New Levelling Control and Automation System, Testing and Commissioning

 

IZMIR SHIPYARD NAVY EAST DOCK & MAINTENANCE DOCK CONSTRUCTION

CLIENT: Turkish Ministry of Defense Izmir Shipyard Commandership
LOCATION: Izmir / Turkey
GENERAL CONTRACTOR: Kasktaş A.S.
SUBCONTRACTOR: Nogay Group
DURATION: August 2001 – May 2002
SCOPE OF WORKS: Bridge Construction, Stream Improvement, Dock Construction and Improvement, Site Civil Works

 

POTIPORT WHITE PETROLEUM PRODUCT STORAGE TERMINAL

CLIENT: Delta Oil Company
LOCATION: Poti / Georgia
GENERAL CONTRACTOR: Ustay Construction
SUBCONTRACTOR: Nogay Group
DURATION: February 2002 – August 2002
SCOPE OF WORKS: Petroleum tanks fabrication, erection, sand blasting & painting works (35.000 m³) pump station, process piping, fire fighting systems, railway off-loading and ship loading units.

 

POTIPORT OIL STORAGE TERMINAL PH.1B PROJECT

CLIENT: Delta Oil Company
LOCATION: Poti / Georgia
GENERAL CONTRACTOR: Ustay Construction
SUBCONTRACTOR: Nogay Group
DURATION: June 2003 – June 2004
CAPACITY: 4 X 20.000 m³
SCOPE OF WORKS: Fabrication and erection of storage tanks and installation of all ancillary equipment (4 Tanks 20.000 m³)

 

ASTANA AIRPORT RECONSTRUCTION PROJECT

CLIENT: Delta Oil Company
LOCATION: Poti / Georgia
GENERAL CONTRACTOR: Ustay Construction
SUBCONTRACTOR: Nogay Group
DURATION: June 2003 – June 2004
CAPACITY: 4 X 20.000 m³
SCOPE OF WORKS: Fabrication and erection of storage tanks and installation of all ancillary equipment (4 Tanks 20.000 m³)

TCO IB-MOA – MAINTENANCE & LABORATORY PROJECT

CLIENT: TCO (TENGIZCHEVROIL)
LOCATION: Tengiz / Kazakhstan
CONSULTANT: KBR (KELLOG BROWN & ROOT)
SUBCONTRACTOR: Nogay Group
DURATION: July 2005 – October 2007
CONSTRUCTION AREA: 27,134 m²
SCOPE OF WORKS: EPCC Contract (Engineering, Procurement, Construction and Commisioning)

 

TCO IB-MOA CANTEEN & ARCHIVE PROJECT

CLIENT: TCO (TENGIZCHEVROIL)
LOCATION: Tengiz / Kazakhstan
CONSULTANT: KBR (KELLOG BROWN & ROOT)
SUBCONTRACTOR: Nogay Group
DURATION: May 2006 – December 2007
CONSTRUCTION AREA: 7,676 m²
SCOPE OF WORKS: EPCC Contract (Engineering, Procurement, Construction and Commisioning)

 

PHILIP MORRIS GREENFIELD
PROJECT

CLIENT: Philip Morris International
LOCATION: Kharkov / Ukraine
CONSULTANT: BLL Int’I (Bovis Lend Lease)
GENERAL CONTRACTOR: GSE Ukraine – (France)
SUBCONTRACTOR: Nogay Group
DURATION: May 2004 – May 2006
CONSTRUCTION AREA: 45,000 m²
SCOPE OF WORKS: Turn-Key Mechanical Works (Procurement, Installation and Commissioning) HAVAC, Process Steam, Compressed Air, Fuel Oil System, Pumping, Fire Fighting System

 

TCO/SCHLUMBERGER CONSOLIDATED SERVICE CENTER

CLIENT: TCO – Schlumberger Logelco Inc.
LOCATION: Tengiz / Kazakhstan
CONSULTANT: J.M. Regnault & Partners
CONTRACTOR: Nogay Group
DURATION: November 2001 – November 2003
CONSTRUCTION AREA: 13,500 m²
SCOPE OF WORKS: EPCC Contract (Engineering, Procurement, Construction and Commisioning)

 

TECHNO PARK PROJECT

CLIENT: Tecnology Transfer & Enginering Of Kazakhstan
LOCATION: Almaty / Kazakhstan
GENERAL CONTRACTOR: NOGAY P-KZ LLP.
DURATION: May 2004 – May 2006
CONSTRUCTION AREA: 21,000 m²
SCOPE OF WORKS: Turn-Key Mechanical Works (Procurement, Installation and Commissioning) HAVAC, Process Steam, Compressed Air, Fuel Oil System, Pumping, Fire Fighting System

 

LIBYA HOSPITAL RENOVATION PROJECT

CLIENT: ODAC
LOCATION: Al Ageilat / Libya
GENERAL CONTRACTOR: OZTAS A.S.
SUBCONTRACTOR: Nogay Group
DURATION: February 2008 – June 2009
CONSTRUCTION AREA: 15,000 m²
SCOPE OF WORKS: System, Plumbing System, Fire Fighting System, Building Automation System and Infrastructure Works with All Hospital’s Installation Renovation (Procurement, Construction, Start-up, Commissioning)

 

OTHER PROJECTS

STRATEGIE INSTITUTE

CLIENT: Almaty Kulbit Story
LOCATION: Almaty / Kazakhstan
DURATION: February 2003 – January 2005
CONSTRUCTION AREA: 21,000 m²
SCOPE OF WORKS: Heating, Cooling & Ventilation System, Plumbing System, Fire Fighting System, Small Power Distribution System, Lighting, Earthing, Architectural Lighting (Procurement, Construction, Startup Commissioning)

 

BAKU INTERNATIONAL AIRPORT TERMINAL & BUILDING RENOVATION

CLIENT: Azerbaijan Airlines (Azal)
LOCATION: Baku / Azerbaijan
GENERAL CONTRACTOR: Burc – ENKA J.V.
SUBCONTRACTOR: Nogay Group
DURATION: July 1998 – November 2000
CONSTRUCTION AREA: 55,000 m²
SCOPE OF WORKS: H.V.A.C. System, Plumbing System, Fire Fighting System, Building Automation System, Start-up and Commissioning Infrastructure Works, As-Built Drawings (Procurement, Construction, Start-up, Commissioning)

 

ENKA SCHOOLS, HIGH SCHOOL & AUDITORIUM

CLIENT: ENKA Foundation
LOCATION: Istanbul / Turkey
CONTRACTOR: Enka Construction.
SUBCONTRACTOR: Nogay Group
DURATION: October 1997 – November 1998
CONSTRUCTION AREA: 15,000 m²
SCOPE OF WORKS: H.V.A.C System, Plumbing System, Fire Fighting System, Building Automation System, Infrastructure Works (Procurement, Construction, Start-up, Commissioning)

21. CENTURY COLLEGE PROJECT

CLIENT: Dengemek
LOCATION: Istanbul / Turkey
GENERAL CONTRACTOR: Batu Yapi A.S.
SUBCONTRACTOR: Nogay Group
DURATION: June 1997 – September 1997
CONSTRUCTION AREA: 15,000 m²
SCOPE OF WORKS: H.V.A.C System, Plumbing System, Fire Fighting System, Building Automation System, Infrastructure Works (Procurement, Construction, Start-up, Commissioning)

 

DENGEMEK SHOPPING MALL

CLIENT: Dengemek
LOCATION: Istanbul / Turkey
GENERAL CONTRACTOR: Batu Yapi A.S.
SUBCONTRACTOR: Nogay Group
DURATION: March 1997 – June 1998
CONSTRUCTION AREA: 7,000 m²
SCOPE OF WORKS: H.V.A.C System, Plumbing System, Fire Fighting System, Building Automation System, Infrastructure Works (Procurement, Construction, Start-up, Commissioning)